MIL-DTL-87104C
4.6.4.13.3.3 Accept-reject criteria (procedure III) (see 3.5.3.15). The test sample shall be considered as having
passed the leakage test if there was no evidence of bubbles coming from within the equipment while submerged.
4.7 Reliability tests (see 3.4.7 and 6.2). When required by the acquiring activity, reliability tests must be
conducted.
4.8 Maintainability demonstration. When required by the acquiring activity, maintainability demonstration shall be
4.9 Test data preparation.
4.9.1 Test procedures. Unless otherwise specified by the acquiring activity, the contractor shall prepare detailed
test procedures, subject to the approval of the acquiring activity prior to the start of the first article or the conformance
test program. The acquiring activity shall reserve the right to modify the tests or require any additional tests deemed
necessary to determine compliance with the requirements of this document. Unless otherwise specified, the
approved test procedures shall be considered a part of this specification and a separate test procedure shall be
required for each different test.
4.9.2 Test reports. Unless otherwise specified by the acquiring activity, the contractor must prepare a test report,
with the additions and exceptions specified herein, for each test procedure.
4.9.2.1 Examination of product test reports.
4.9.2.1.1 Procedure I. The test report for procedure I shall include data to show compliance with each and every
characteristic of the equipment examined. This shall include measured data to show compliance with all physical
requirements. Certificates of compliance may be substituted for data providing they contain positive identification, or
a totally defining description, of the materials, processes, finishes, or design characteristics being certified.
4.9.2.1.2 Procedures II and IV. A detailed description of the exact condition of the equipment shall be recorded on
the test data sheet for procedures II and IV.
4.9.2.1.3 Procedure III. A copy of all X-ray photographs taken along with the laboratory test report shall be
submitted with the test report for procedure III.
4.9.2.1.4 Procedure V. The test report for procedure V shall include signed certifications that the design,
construction, material, finishes, and processes are identical to the equipment that was subjected to the first article test
program.
4.9.2.1.5 Procedure VI. The test report for procedure VI shall include data to define every characteristic of the
cable examined. This shall include measured data for all physical parameters. Certificates of compliance may be
substituted for data providing they contain positive identification of, or a totally defining description of the materials,
processes, finishes, or design characteristics being certified.
4.9.2.2 Contractor's certification. Each test report shall contain the following certification, which shall be signed by
a responsible officer of the contractor's organization.
The data contained in this report has been obtained in accordance with the requirements specified in
(specific test procedure, applicable revision, and date) and has been reviewed, verified, and certified
to be as stated. The unit under test is certified to have (passed/failed) this test.
4.9.2.3 Government certification. Each test report shall contain the following certification, which shall be signed by
the cognizant Government representative.
This test was performed under my cognizance and, to the best of my knowledge, the test and all
data contained in the test report was accomplished in accordance with applicable test procedure.
62