MIL-PRF-49204B(CR)
4.2
First article inspection. This inspection shall consist of the
inspection
specified in Table I and shall include inspection specified in
subsidiary
documents and the supplementary tests. Order and quantity of
equipments
to be subjected to First Article Testing shall be as specified in
Table I.
4.2.1 Standard of workmanship. Standard of workmanship, 3.11, shall be
established during the Visual Inspections of 4.12.1.
TABLE I.
First article test schedule.
SEQUENCE
UNIT
UNIT
UNIT
UNIT
UNIT
TITLE
RQT PARA
INSP PARA
1
2
3
4
5
1
1
1
1
4.12.1
3.11
Visual Inspection
2
2
2
2
2
4.12.2
3.4.1
Transmission Line
3
3
3
3
3
4.12.3
3.6.9.3
Balun VSWR
4
4
4
4
4
4.12.4
3.7.7
Air Pressure
5
5
5
5
5
4.12.5
3.4, 3.9
Item Count
6
6
7
6
6
6
4.13.1
3.7.3
Weight
7
8
7
7
7
4.13.2
3.7.4
Transport Size
8
9
8
8
8
4.13.3
3.6.9.2
Coupling Loss
9
9
9
9
4.13.4
3.7.5
Interchangeability
10
4.14.1
3.8.1.1
High Temperature
11
4.14.2
3.8.1.2
Low Temperature
10
4.14.3
3.8.2
Humidity
10
11
13
11
4.14.4
3.6.5
Antenna Gain
12
4.14.5
3.8.7
Drop
13
15
4.14.6
3.8.8
Wind Load
17
14
4.14.7
Immersion
1
4.11.2
Salt Fog
4.11.3
Dust
10
4.11.4
3.6.6
Radiation Pattern
12
4.11.5
3.8.6
Bounce Loose Cargo
12
4.11.1
3.8.3
Fungus
14
4.13.5
3.7.6
Feedcone
10
Structural
11
14
11
16
13
Integrity
4.2.2 Procedure in the Event of Failure During the First Article
Inspection. The procedure for failures in first article inspection shall be
as specified in the contract or purchase order.
4.3 Conformance Inspection. The contractor shall perform the
inspection specified in 4.3 and 4.5 through 4.8. This does not relieve the
contractor of his responsibility for perform any additional inspection which
is necessary to control the quality of the product and the assure compliance
with all specification requirements.
7
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business