MIL-DTL-49295C
4.4.2.1 Group B sampling plan.
4.4.2.2 Order of inspection within group B. Group B inspection shall be performed in any order which is
satisfactory to the Government.
TABLE I. First article test schedule.
Title
Requirement
Test
method
method
Inspection covered
Mandatory inspection to be
by subsidiary
3.2.3, 3.2.4,
performed on all first article units.
documents
Group A
Inspection
Group B
Inspection
Sequence
Group C
Unit
Unit
Unit
Unit
Unit
Inspection
1
2
3
4
5
Environmental:
Sunshine
1
Low temperature
4.10.1.2
1
High temperature
4.10.1.1
2
Immersion
4.10.4
3
Humidity
4.10.8
1
Bounce/loose
cargo
2
Drop shock
1
Dust
4.10.2
2
Salt fog
3.5.5
4.10.3
3
Fungus
4.10.7
1
Rain
4.10.5
2
Wind/ice load
4
TABLE II. Group A Inspection.
Title
Requirement method
Test method
Mechanical/visual inspection
Antenna impedance
Transmission line
Matching transformer VSWR
Coupling loss
Dissipation transmission line
Matching transformer leakage
4.4.2.3 Procedure in the event of failure during group B inspection. In the event of failure to pass any group B
inspection item the unit shall be corrected as necessary then resubmitted to group B inspection.
4.4.3 Group C inspection. This inspection shall consist of the tests specified in table IV and shall be performed on
sample units that have been subjected to and that have met group A and group B inspection. Sample units shall be
selected in accordance with 4.4.3.1.