MIL-DTL-49295C
TABLE III. Group B Inspection.
Title
Requirement method
Test method
Weight
Transport size
Matching transformer
structural integrity
Interchangeability
Radiation pattern
Antenna gain
TABLE IV. Group C Inspection.
Title
Requirement method
Test method
Sampling method
Low temperature
4.10.1.2
High temperature
4.10.1.1
Immersion
4.10.4
Matching transformer
structural integrity
Humidity
4.10.8
Bounce/loose cargo
Drop shock
Rain
4.10.5
Wind/ice load
Sunshine
Dust
4.10.2
Salt fog 1/
3.5.5
4.10.3
Fungus 1/
4.10.7
1/ The equipment shall be thoroughly washed, cleaned, dried and refurbished after this inspection before
Proceeding with subsequent inspection.
4.4.3.1 Sampling for inspection of equipment. Units selected for each group C inspection shall be selected without
regard to their quality in accordance with the following:
a. Two units from the first 50 production units shall be selected for this first group C inspection. For subsequent
group C inspections, two units from each successive 250 or two per month if less than 250 are produced
monthly, shall be selected. Both units shall be subjected to all testing in the order specified in table IV.
b. Two units from the first 50 production units shall be selected for this group C inspection. For subsequent
group C inspections, two units from each successive 500, or two every two months, if less than 500 are
produced during a two month period. One unit shall be subjected to humidity testing, one unit shall be
subjected to bounce (loose cargo) testing.
c. Two units from the first 50 production units shall be selected for the first group C inspection. For subsequent
group C inspections, two units shall be selected from each successive 600, or two every three months, if
less than 600 are produced during this three month period. All tests need not be performed on each unit.
The testing may be divided between the two units as long as all tests are performed.
d. Two units from the first 50 production units shall be selected for the first group C inspection. For subsequent
group C inspections, two units shall be selected from every six (6) months production. The tests may be
divided between the two units.
e. Two units from the first 500 production units shall be selected for the first group C inspection.
8
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business